Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 CANAL ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'Callalisa Creek ' (1) ·
'CYPRESS CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'EL RIO CANAL ' (1) ·
'Halifax River ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'Jupiter Creek ' (1) ·
'Long Creek ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-91 Turnpike ' (1) ·
'Thompson River ' (1) ·
'Tide Relief Canal ' (1) ·
'West Palm Beach Canal ' (1) ·
Tillman Canal (1)
'EB Okee. Blvd. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'FLYING COW ROAD ' (1) ·
'Indiantown Road ' (1) ·
'LINTON BLVD. ' (1) ·
'MILITARY TR. NB ' (1) ·
'Military Trail ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'NW 7TH STREET ' (1) ·
'PALMWOOD ROAD ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR-44 ' (1) ·
'SR-A1A ' (1) ·
'WB Martin Downs Bd' (1) ·
SR-507 SB (1)
700190 (1) ·
790147 (1) ·
790148 (1) ·
790151 (1) ·
790152 (1) ·
890143 (1) ·
930361 (1) ·
930409 (1) ·
930410 (1) ·
930418 (1) ·
930420 (1) ·
934136 (1) ·
934138 (1) ·
934292 (1) ·
934483 (1) ·
934935 (1) ·
935221 (1) ·
940139 (1) ·
940140 (1)
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'AT SR-80 ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-704 Over SR-91 ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'SR-A1A over Halifax River' (1) ·
SR-507 SB-Tillman Canal (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.