Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'CYPRESS CREEK ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-3 Canal ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Halifax River ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L.W.D.D L-14 CANAL ' (1) ·
'LAKE OSBOURNE ' (1) ·
'LAKEWOOD E4 CANAL ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'Lateral Canal 30 ' (1) ·
'LEVEE NO. 8 ' (1) ·
'Little Haw Swamp ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'SR-514 ' (1) ·
'SR-9 (I-95) ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'CENTER DR. ' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CENTRE PK. DR. N. ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'EB Forest Hill Bld' (1) ·
'Forest Hill Blvd. ' (1) ·
'HYPOLUXO RD. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'Orange Avenue ' (1) ·
'PALOMINO DRIVE ' (1) ·
'SR-808 Glades Road' (1) ·
'SR-80EB (Southern)' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'St Lucie West Blvd' (1) ·
'Truck Trail #12 ' (1) ·
'US-27 (SR-25) ' (1)
700202 (1) ·
790800 (1) ·
794120 (1) ·
930342 (1) ·
930408 (1) ·
930412 (1) ·
930414 (1) ·
930415 (1) ·
930455 (1) ·
934128 (1) ·
934129 (1) ·
934161 (1) ·
934328 (1) ·
934329 (1) ·
934341 (1) ·
934342 (1) ·
934344 (1) ·
934347 (1) ·
934349 (1) ·
934350 (1) ·
937715 (1) ·
937716 (1) ·
940133 (1)
'.25 Mi E of AUSTRALIAN ' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.3MI E OF CONGRESS AVE ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.8MI N OF LAKEWORTH BLVD' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'I-95 - SR-514 ' (1) ·
'Lake George Conservation ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
26220391 (1) ·
26220396 (1) ·
26221756 (1) ·
26290100 (1) ·
26342018 (1) ·
26350275 (1) ·
26351510 (1) ·
26351567 (1) ·
26360890 (1) ·
26363478 (1) ·
26374169 (1) ·
26390288 (1) ·
26390702 (1) ·
26410616 (1) ·
26413718 (1) ·
26414389 (1) ·
26525465 (1) ·
26525635 (1) ·
26525705 (1) ·
27184103 (1) ·
27595475 (1) ·
29123122 (1) ·
29153934 (1)
80023162 (1) ·
80040991 (1) ·
80041853 (1) ·
80042221 (1) ·
80043939 (1) ·
80043945 (1) ·
80044182 (1) ·
80044190 (1) ·
80044906 (1) ·
80050470 (1) ·
80051026 (1) ·
80074322 (1) ·
80101354 (1) ·
80101504 (1) ·
80101677 (1) ·
80102688 (1) ·
80121445 (1) ·
80215065 (1) ·
80245322 (1) ·
80374985 (1) ·
80424182 (1) ·
81010006 (1) ·
81211913 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)