Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'Drainage Canal ' (1) ·
'E-1 Canal ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-3 Canal ' (1) ·
'Eau-Gallie River ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'I-4 ' (1) ·
'L-5 CANAL ' (1) ·
'LEVEE NO. 8 ' (1) ·
'Long Creek ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'N Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'SR-9 (I-95) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
Indian River Relief East (1)
'BOB W RD 130TH ST.' (1) ·
'BROWNS FARM/CR-827' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CENTRE PK. DR. N. ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'Forest Hill Blvd. ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (SB) ' (1) ·
'PALOMINO DRIVE ' (1) ·
'Saxon Blvd WB ' (1) ·
'SR-518 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-76 ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'SR-808 Glades Road' (1) ·
'SR-80EB (Southern)' (1) ·
'St Lucie West Blvd' (1) ·
'US-27 (SR-25) ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1) ·
SR-520 (1)
700191 (1) ·
700196 (1) ·
790166 (1) ·
890141 (1) ·
890142 (1) ·
930342 (1) ·
930408 (1) ·
930414 (1) ·
930415 (1) ·
934271 (1) ·
934273 (1) ·
934327 (1) ·
934328 (1) ·
934329 (1) ·
934347 (1) ·
934488 (1) ·
934518 (1) ·
937715 (1) ·
937716 (1) ·
940133 (1) ·
940143 (1) ·
940144 (1) ·
940145 (1)
'.25 Mi E of AUSTRALIAN ' (1) ·
'.5mi So. of St Lucie Blvd' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8MI N OF LAKEWORTH BLVD' (1) ·
'1.5mi East of Indiantown' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-518 over Eau-Gallie R.' (1) ·
'US-27 OVER BOLLES CANAL ' (1) ·
SR-520 - Indian River Relief (1)
26220391 (1) ·
26220396 (1) ·
26290151 (1) ·
26320076 (1) ·
26350275 (1) ·
26363478 (1) ·
26374169 (1) ·
26390331 (1) ·
26390702 (1) ·
26401260 (1) ·
26404140 (1) ·
26410616 (1) ·
26413718 (1) ·
26414389 (1) ·
27011358 (1) ·
27014124 (1) ·
27161886 (1) ·
27161895 (1) ·
27184103 (1) ·
27283673 (1) ·
28074371 (1) ·
28212382 (1) ·
28544052 (1)
80023162 (1) ·
80041853 (1) ·
80042221 (1) ·
80074322 (1) ·
80084271 (1) ·
80084275 (1) ·
80101354 (1) ·
80101677 (1) ·
80121068 (1) ·
80121445 (1) ·
80121591 (1) ·
80191739 (1) ·
80192691 (1) ·
80215065 (1) ·
80235569 (1) ·
80244814 (1) ·
80245322 (1) ·
80260193 (1) ·
80293882 (1) ·
80390094 (1) ·
80423456 (1) ·
80424182 (1) ·
81161842 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)