Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Eau Gallie River ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'Lake Worth Lagoon ' (1) ·
'LEVEE NO.8 ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'Nova Canal ' (1) ·
'Platt Ranch Access Road ' (1) ·
'Reed Canal ' (1) ·
Indian River ICW (1)
'AUDUBON CSWY ' (1) ·
'Big Tree Road ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'Lantern Park Drive' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'Quantum Blvd. ' (1) ·
'SR A1A ' (1) ·
'SR-80WB (Southern)' (1) ·
'St. Johns Heritage' (1) ·
'WB SR-710 ' (1) ·
'Wickham Road ' (1) ·
SR-518 (1)
700184 (1) ·
704190 (1) ·
704197 (1) ·
794154 (1) ·
796549 (1) ·
884055 (1) ·
930362 (1) ·
930407 (1) ·
930547 (1) ·
934482 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1) ·
936451 (1) ·
937367 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.19Mi. E of Congress Ave' (1) ·
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'2.9 Miles South of US-192' (1) ·
'3 Miles West of SR-786 ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'CR-509 .5 Mi N of SR-518 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-5A - Big Tree Rd ' (1) ·
SR-518 over Indian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)