Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'C-51 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'Header Creek Canal ' (1) ·
'I-4 ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LEVEE NO.8 ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'Nova Canal ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Ten Mile Creek ' (1) ·
Sebastian River (1)
'Benoist Farms Rd ' (1) ·
'Big Tree Road ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'EB SR 70 ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'Orange camp Rd. ' (1) ·
'Quantum Blvd. ' (1) ·
'SR 70 EB ' (1) ·
'SR 710 ' (1) ·
'SR A1A ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR-91 TPK NS 81.77' (1) ·
US-1 (1)
700224 (1) ·
790211 (1) ·
794154 (1) ·
884055 (1) ·
930407 (1) ·
930534 (1) ·
931006 (1) ·
934482 (1) ·
934711 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1) ·
940154 (1) ·
940156 (1) ·
940158 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'3.9 MI W of FL Tpk SR 91 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'7 MI W of FL TPK SR91 ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-5A - Big Tree Rd ' (1) ·
US-1 over Sebastian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)