Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'CSX-RR ' (1) ·
'E-1 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'Halifax River IWW ' (1) ·
'I 95 and SR 704 ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'LEVEE NO.8 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'Nova Canal ' (1) ·
'Rose Bay ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N. Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'St. Lucie River ' (1) ·
'St.Lucie River ' (1) ·
'Tomoka River ' (1) ·
Indian River ICW (1)
'Atlantic Ave. ' (1) ·
'Big Tree Road ' (1) ·
'Boynton Beach Blvd' (1) ·
'CR-516 ' (1) ·
'E/B S.R. A1A ' (1) ·
'SR-44 ' (1) ·
'SR-518 ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR804 E Ocean Ave.' (1) ·
'US 98 (SR 80) ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1) ·
'W/B S.R. A1A ' (1) ·
'WB SR-710 ' (1) ·
'WB SR704 to SB I95' (1) ·
SR-518 (1)
700183 (1) ·
700184 (1) ·
700188 (1) ·
790156 (1) ·
790158 (1) ·
790160 (1) ·
790161 (1) ·
790176 (1) ·
790185 (1) ·
790187 (1) ·
790188 (1) ·
794154 (1) ·
890158 (1) ·
890160 (1) ·
930362 (1) ·
930370 (1) ·
930407 (1) ·
930439 (1) ·
930463 (1) ·
930464 (1) ·
930469 (1)
'1 Mile S of Boynton Inlet' (1) ·
'3 Miles West of SR-786 ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'Boynton Bch Blvd at SR-7 ' (1) ·
'CR-516 over I-95 ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'Southern Blvd / E-3 Canal' (1) ·
'SR-44 over CSX-RR ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'SR-5A - Big Tree Rd ' (1) ·
'US-1 NB - Spruce Cr. S. ' (1) ·
'US-1 NB - Spruce Creek ' (1) ·
'US-1 SB - Tomoka River ' (1) ·
'US-1 SB over Rose Bay ' (1) ·
'US-92 EB - Halifax River ' (1) ·
'US-92 WB - Halifax Ri IWW' (1) ·
SR-518 over Indian River (1)
26271300 (1) ·
26313736 (1) ·
26314000 (1) ·
26404080 (1) ·
26410722 (1) ·
26422570 (1) ·
26522014 (1) ·
27115581 (1) ·
27115681 (1) ·
28020728 (1) ·
28075792 (1) ·
28081497 (1) ·
29012750 (1) ·
29050250 (1) ·
29051110 (1) ·
29051931 (1) ·
29061303 (1) ·
29095834 (1) ·
29125666 (1) ·
29125688 (1) ·
29181820 (1)
80031431 (1) ·
80043790 (1) ·
80074325 (1) ·
80121500 (1) ·
80121800 (1) ·
80122748 (1) ·
80122859 (1) ·
80144324 (1) ·
80214953 (1) ·
80360766 (1) ·
80370269 (1) ·
80392393 (1) ·
80580170 (1) ·
80580651 (1) ·
80581106 (1) ·
80581931 (1) ·
81005684 (1) ·
81005748 (1) ·
81012484 (1) ·
81053911 (1) ·
81211769 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)