Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'Bulow Creek ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'CANAL E-1 ' (1) ·
'EL RIO CANAL ' (1) ·
'Little Cow Creek ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'Samsula Canal ' (1) ·
'WARNER CREEK ' (1)
'ARMONE PLACE ' (1) ·
'CAMINO REAL ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'Cow Creek Road ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'Hunting Camp Road ' (1) ·
'ISLAND WAY ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Samsula Drive ' (1) ·
'TROPICALIA AVE. ' (1) ·
'Walter Boardman Ln' (1)
794126 (1) ·
794130 (1) ·
794184 (1) ·
794185 (1) ·
884055 (1) ·
884056 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
934126 (1) ·
934240 (1) ·
934489 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
934950 (1) ·
934960 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'250ft North of SR-60 ' (1) ·
'AT SR-7 US-441 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 18 results in range #1 to #18.