Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bulow Creek ' (1) ·
'C-37 Canal ' (1) ·
'CANAL E-1 ' (1) ·
'E-1 CANAL ' (1) ·
'FL. TURNPIKE ' (1) ·
'I-95 ' (1) ·
'Little Cow Creek ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'M CANAL ' (1) ·
'N CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'Samsula Canal ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'20TH AVENUE ' (1) ·
'ARMONE PLACE ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'Cow Creek Road ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'HAVERHILL ROAD ' (1) ·
'Hunting Camp Road ' (1) ·
'INDIAN STREET ' (1) ·
'Minton Rd. ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'Palm Bay Library ' (1) ·
'Samsula Drive ' (1) ·
'SUMMIT BLVD ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'Walter Boardman Ln' (1) ·
'YAMATO RD ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
704143 (1) ·
704256 (1) ·
794126 (1) ·
794130 (1) ·
794184 (1) ·
794185 (1) ·
884055 (1) ·
884062 (1) ·
894040 (1) ·
934228 (1) ·
934256 (1) ·
934489 (1) ·
934506 (1) ·
934922 (1) ·
934923 (1) ·
934928 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
934945 (1) ·
934946 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'10ft. E of Minton Road ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'AT SR-7 US-441 ' (1) ·
'Minton Road-I-95 ' (1)
26212592 (1) ·
26212629 (1) ·
26233914 (1) ·
26233917 (1) ·
26233970 (1) ·
26280864 (1) ·
26280868 (1) ·
26290167 (1) ·
26290169 (1) ·
26331348 (1) ·
26394749 (1) ·
26442375 (1) ·
26450216 (1) ·
27102110 (1) ·
27355685 (1) ·
27413662 (1) ·
27594683 (1) ·
28025656 (1) ·
28563029 (1) ·
28592979 (1) ·
28594816 (1) ·
29242747 (1)
80052317 (1) ·
80052387 (1) ·
80053541 (1) ·
80053609 (1) ·
80070375 (1) ·
80074101 (1) ·
80101583 (1) ·
80101586 (1) ·
80120025 (1) ·
80121064 (1) ·
80121067 (1) ·
80121898 (1) ·
80123610 (1) ·
80242120 (1) ·
80264603 (1) ·
80321756 (1) ·
80401656 (1) ·
80401795 (1) ·
80563010 (1) ·
81022736 (1) ·
81025853 (1) ·
81071865 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)