Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'Canal C-46 ' (1) ·
'CANAL E-1 ' (1) ·
'CYPRESS CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'Jupiter Creek ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LEVEE NO.8 ' (1) ·
'Long Creek ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'Nova Canal ' (1) ·
'RIO MAR BAY ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-91 Turnpike ' (1) ·
Indian River ICW (1) ·
Tillman Canal (1)
'ARMONE PLACE ' (1) ·
'Big Tree Road ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-516 ' (1) ·
'EB Okee. Blvd. ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'Eldron Blvd. ' (1) ·
'FLYING COW ROAD ' (1) ·
'Indiantown Road ' (1) ·
'LINTON BLVD. ' (1) ·
'MILITARY TR. NB ' (1) ·
'NW 7TH STREET ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'PALMWOOD ROAD ' (1) ·
'Quantum Blvd. ' (1) ·
'SR-518 ' (1) ·
'SR-80WB (Southern)' (1) ·
'VETERANS WALK ' (1) ·
'WB Martin Downs Bd' (1) ·
'WB SR-710 ' (1) ·
SR-507 SB (1) ·
SR-518 (1)
700183 (1) ·
700184 (1) ·
700188 (1) ·
700190 (1) ·
705917 (1) ·
794154 (1) ·
885808 (1) ·
890143 (1) ·
930362 (1) ·
930407 (1) ·
930418 (1) ·
930420 (1) ·
934136 (1) ·
934292 (1) ·
934482 (1) ·
934483 (1) ·
934489 (1) ·
934930 (1) ·
934935 (1) ·
935221 (1) ·
936375 (1) ·
940139 (1) ·
940140 (1)
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.19Mi. E of Congress Ave' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'AT SR-7 US-441 ' (1) ·
'AT SR-80 ' (1) ·
'CR-516 over I-95 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'SR-5A - Big Tree Rd ' (1) ·
'SR-704 Over SR-91 ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
SR-507 SB-Tillman Canal (1) ·
SR-518 over Indian River (1)
26212337 (1) ·
26260295 (1) ·
26262125 (1) ·
26290167 (1) ·
26322014 (1) ·
26325650 (1) ·
26331348 (1) ·
26405799 (1) ·
26410722 (1) ·
26422701 (1) ·
26522014 (1) ·
26530408 (1) ·
26560189 (1) ·
27103152 (1) ·
27161795 (1) ·
27161803 (1) ·
27385354 (1) ·
27581117 (1) ·
28004740 (1) ·
28020728 (1) ·
28075792 (1) ·
28081497 (1) ·
29095834 (1)
80043190 (1) ·
80051020 (1) ·
80052317 (1) ·
80055370 (1) ·
80055723 (1) ·
80064817 (1) ·
80072177 (1) ·
80083008 (1) ·
80092461 (1) ·
80121898 (1) ·
80144324 (1) ·
80153061 (1) ·
80175381 (1) ·
80192218 (1) ·
80193090 (1) ·
80214953 (1) ·
80220390 (1) ·
80360766 (1) ·
80370269 (1) ·
80372030 (1) ·
80392393 (1) ·
80393940 (1) ·
81012484 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.