Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12260 (1) ·
12270 (1) ·
12272 (1) ·
13796 (1) ·
13797 (1) ·
13802 (1) ·
15174 (1) ·
15175 (1) ·
15243 (1) ·
15244 (1) ·
15245 (1) ·
15254 (1) ·
15255 (1) ·
15259 (1) ·
15694 (1) ·
15708 (1) ·
15711 (1) ·
15820 (1) ·
15826 (1) ·
15885 (1) ·
15889 (1) ·
15901 (1) ·
15904 (1) ·
17890 (1) ·
17896 (1) ·
17913 (1) ·
19210 (1) ·
19505 (1)
'14TH STREET CANAL ' (1) ·
'Beamer's Ditch ' (1) ·
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'DRAINAGE DITCH ' (1) ·
'E-1 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'Goat Creek ' (1) ·
'Hanson Grant Outlet ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Konomac Canal ' (1) ·
'Lake Osborne ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'Sebastian Canal East ' (1) ·
'Sebastian Canal West ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'SR-91 (Fla. Turnpike) ' (1) ·
'Turkey Creek ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1) ·
'W. Relief Indian River ' (1)
'13th Street SW ' (1) ·
'Apollo Boulevard ' (1) ·
'Briar Creek Blvd. ' (1) ·
'Camp Site Road ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'CR-603-IND RIV BLV' (1) ·
'Fort Florida Road ' (1) ·
'Haverhill Rd ' (1) ·
'Hood Road ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Indiantown Rd. ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'S. VERDE TRAIL ' (1) ·
'SR-76 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-9(I-95) ' (1) ·
'Tadlock Ave. ' (1) ·
'Volco Road ' (1) ·
'Wilden Road ' (1)
700236 (1) ·
704085 (1) ·
704086 (1) ·
704191 (1) ·
705500 (1) ·
705604 (1) ·
794131 (1) ·
794133 (1) ·
794162 (1) ·
884053 (1) ·
884054 (1) ·
884105 (1) ·
890123 (1) ·
890126 (1) ·
890127 (1) ·
890138 (1) ·
890139 (1) ·
890144 (1) ·
930374 (1) ·
930391 (1) ·
930398 (1) ·
934295 (1) ·
934313 (1) ·
934373 (1) ·
934903 (1) ·
934908 (1) ·
934924 (1) ·
934927 (1)
'.15 mi W of Fleming Grant' (1) ·
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'.5 mi East of I-95 ' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.9mi S of SR-520 ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'2 MILES N OF CR-708 ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'2.5MI N OF INDIANTOWN RD ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'At S Military Trail ' (1) ·
'I-95 (2 mi. N. of SR-76) ' (1) ·
'In John Prince Park ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'Tpk. / SR 706 Interchange' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
25564070 (1) ·
26205893 (1) ·
26210242 (1) ·
26212624 (1) ·
26235178 (1) ·
26355670 (1) ·
26360809 (1) ·
26403896 (1) ·
26515340 (1) ·
26560311 (1) ·
26575410 (1) ·
27041365 (1) ·
27061911 (1) ·
27064891 (1) ·
27073439 (1) ·
27150311 (1) ·
27344850 (1) ·
27373700 (1) ·
27385877 (1) ·
27512287 (1) ·
27512302 (1) ·
27580021 (1) ·
28003795 (1) ·
28073710 (1) ·
28205754 (1) ·
28515436 (1) ·
28543436 (1) ·
28544228 (1)
80043210 (1) ·
80045020 (1) ·
80070400 (1) ·
80071317 (1) ·
80074514 (1) ·
80083165 (1) ·
80102114 (1) ·
80112200 (1) ·
80120027 (1) ·
80121038 (1) ·
80133779 (1) ·
80144362 (1) ·
80152053 (1) ·
80155436 (1) ·
80170982 (1) ·
80224294 (1) ·
80232401 (1) ·
80264970 (1) ·
80312618 (1) ·
80312721 (1) ·
80325084 (1) ·
80355219 (1) ·
80384610 (1) ·
80471577 (1) ·
80543046 (1) ·
80544759 (1) ·
80901477 (1) ·
81205307 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 28 results in range #1 to #28.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)