Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'E-2 Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'Konomac Canal ' (1) ·
'L-78 Borrow Canal ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR-76 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'St. Lucie Canal ' (1) ·
'Turkey Creek ' (1)
'Briar Creek Blvd. ' (1) ·
'E/B S.R. 704 ' (1) ·
'Fort Florida Road ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Pioneer Road ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-60 EB ' (1) ·
'SR-76 ' (1) ·
'SR-76(Kanner Hwy )' (1)
705500 (1) ·
794162 (1) ·
880097 (1) ·
890121 (1) ·
890122 (1) ·
890126 (1) ·
890127 (1) ·
890128 (1) ·
890129 (1) ·
890132 (1) ·
890133 (1) ·
930394 (1) ·
930507 (1) ·
934721 (1)
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'SR 706 to I 95 Ramp ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)