Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'Donald Ross Road ' (1) ·
'ELKCAM CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Goat Creek ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'TEN MILE CREEK ' (1)
'AIROSO BLVD. ' (1) ·
'BELVEDERE ROAD ' (1) ·
'GORDY ROAD ' (1) ·
'Haverhill Rd ' (1) ·
'Hood Road ' (1) ·
'Indiantown Rd. ' (1) ·
'LAKE IDA ROAD ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'S. VERDE TRAIL ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR-76 ' (1) ·
'Tadlock Ave. ' (1) ·
'WB SR706 to SB 95 ' (1)
704191 (1) ·
890127 (1) ·
890128 (1) ·
890129 (1) ·
930371 (1) ·
930372 (1) ·
930382 (1) ·
930383 (1) ·
930385 (1) ·
930386 (1) ·
930387 (1) ·
930391 (1) ·
930394 (1) ·
930398 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934295 (1) ·
934903 (1) ·
934965 (1) ·
944010 (1) ·
944013 (1)
'.25 mi East of I-95 ' (1) ·
'.5 mi East of I-95 ' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.6MI Nof PT ST LUCIE BLD' (1) ·
'At S Military Trail ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'South of Ramp to SR 706 ' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'SR 706 to I 95 Ramp ' (1)
26212624 (1) ·
26281595 (1) ·
26403896 (1) ·
26413216 (1) ·
26483417 (1) ·
26483495 (1) ·
26515340 (1) ·
26525862 (1) ·
26525996 (1) ·
26554560 (1) ·
26554700 (1) ·
26554800 (1) ·
26560311 (1) ·
26560443 (1) ·
26560450 (1) ·
26561248 (1) ·
27063113 (1) ·
27063191 (1) ·
27064891 (1) ·
27173773 (1) ·
27241068 (1) ·
27580021 (1)
80051796 (1) ·
80070400 (1) ·
80071317 (1) ·
80074066 (1) ·
80074402 (1) ·
80074514 (1) ·
80075215 (1) ·
80075217 (1) ·
80083165 (1) ·
80085515 (1) ·
80085650 (1) ·
80085830 (1) ·
80085950 (1) ·
80090063 (1) ·
80090130 (1) ·
80092158 (1) ·
80152053 (1) ·
80153644 (1) ·
80153917 (1) ·
80205857 (1) ·
80235669 (1) ·
80325084 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.