Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-37 Canal ' (1) ·
'E-1 CANAL ' (1) ·
'Goat Creek ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Konomac Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'N CANAL ' (1) ·
'Over D Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'Sebastian Canal West ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR 91 TPK ' (1) ·
'TIDAL CANAL ' (1) ·
'Turkey Creek ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1) ·
'W. Relief Indian River ' (1) ·
'WILLOUGHBY CREEK ' (1)
'20TH AVENUE ' (1) ·
'Briar Creek Blvd. ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'Fort Florida Road ' (1) ·
'HOOD RD 110.944 ' (1) ·
'Hood Road ' (1) ·
'INDIAN STREET ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'Palm Bay Library ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SIMARA STREET ' (1) ·
'Tadlock Ave. ' (1) ·
'Tangerine Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'Volco Road ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1) ·
'Wilden Road ' (1)
704085 (1) ·
704086 (1) ·
704191 (1) ·
704256 (1) ·
705500 (1) ·
794131 (1) ·
794133 (1) ·
794162 (1) ·
884053 (1) ·
884062 (1) ·
890138 (1) ·
894040 (1) ·
895504 (1) ·
930380 (1) ·
930385 (1) ·
930390 (1) ·
930394 (1) ·
930398 (1) ·
930441 (1) ·
930800 (1) ·
934506 (1) ·
934922 (1) ·
934923 (1) ·
934927 (1)
'.15 mi W of Fleming Grant' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'10ft. E of Minton Road ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'SR 706 to I 95 Ramp ' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
26212592 (1) ·
26212629 (1) ·
26235178 (1) ·
26410304 (1) ·
26442375 (1) ·
26515340 (1) ·
26515528 (1) ·
26554560 (1) ·
26560606 (1) ·
26561100 (1) ·
26561248 (1) ·
27102110 (1) ·
27111660 (1) ·
27150311 (1) ·
27355685 (1) ·
27385877 (1) ·
27512287 (1) ·
27512302 (1) ·
27580021 (1) ·
27594683 (1) ·
28003795 (1) ·
28515436 (1) ·
28543436 (1) ·
28544228 (1)
80070400 (1) ·
80074430 (1) ·
80085370 (1) ·
80085830 (1) ·
80090063 (1) ·
80090683 (1) ·
80112090 (1) ·
80120027 (1) ·
80121064 (1) ·
80121067 (1) ·
80123610 (1) ·
80133779 (1) ·
80162939 (1) ·
80232401 (1) ·
80242120 (1) ·
80312618 (1) ·
80312721 (1) ·
80321756 (1) ·
80325084 (1) ·
80355219 (1) ·
80401795 (1) ·
80543046 (1) ·
80544759 (1) ·
81205307 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)