Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12234 (1) ·
12260 (1) ·
12264 (1) ·
12270 (1) ·
12272 (1) ·
13790 (1) ·
13796 (1) ·
13797 (1) ·
13802 (1) ·
15174 (1) ·
15233 (1) ·
15254 (1) ·
15258 (1) ·
15270 (1) ·
15698 (1) ·
15703 (1) ·
15707 (1) ·
15710 (1) ·
15711 (1) ·
15771 (1) ·
15798 (1) ·
15817 (1) ·
15863 (1) ·
15864 (1) ·
15867 (1) ·
15904 (1) ·
15945 (1) ·
17896 (1)
'C-18 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'CYPRESS CREEK ' (1) ·
'DANFORTH CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'EL RIO CANAL ' (1) ·
'Goat Creek ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Konomac Canal ' (1) ·
'Lake Gertie ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'S Fork St. Lucie River ' (1) ·
'Sebastian Canal East ' (1) ·
'Sebastian Canal West ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'Sykes Creek ' (1) ·
'Turkey Creek ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1) ·
'W. Relief Indian River ' (1) ·
'WARNER CREEK ' (1) ·
Tillman Canal (1)
'Briar Creek Blvd. ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'CR-713 ' (1) ·
'CR-92 WB ' (1) ·
'DIXIE HIGHWAY ' (1) ·
'FLYING COW ROAD ' (1) ·
'Fort Florida Road ' (1) ·
'Hood Road ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'NW 7TH STREET ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PALMWOOD ROAD ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'Sea Ray Drive ' (1) ·
'Tadlock Ave. ' (1) ·
'Volco Road ' (1) ·
'WB Martin Downs Bd' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1) ·
'Wilden Road ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1) ·
SR-507 SB (1)
700190 (1) ·
704085 (1) ·
704086 (1) ·
704144 (1) ·
704191 (1) ·
705500 (1) ·
794121 (1) ·
794131 (1) ·
794133 (1) ·
794162 (1) ·
884053 (1) ·
890113 (1) ·
890138 (1) ·
890143 (1) ·
894009 (1) ·
930380 (1) ·
930385 (1) ·
930390 (1) ·
930394 (1) ·
930398 (1) ·
934136 (1) ·
934222 (1) ·
934292 (1) ·
934468 (1) ·
934469 (1) ·
934483 (1) ·
934927 (1) ·
935221 (1)
'.15 mi W of Fleming Grant' (1) ·
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI SOUTH OF CR-714 ' (1) ·
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.4 Mi West of US 17-92 ' (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'AT SR-80 ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'SR 706 to I 95 Ramp ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'W. of Jensen Bch. Cswy. ' (1) ·
SR-507 SB-Tillman Canal (1)
26212337 (1) ·
26235178 (1) ·
26262125 (1) ·
26304774 (1) ·
26304823 (1) ·
26405799 (1) ·
26422263 (1) ·
26515340 (1) ·
26530408 (1) ·
26554560 (1) ·
26560606 (1) ·
26561100 (1) ·
26561248 (1) ·
27092679 (1) ·
27103152 (1) ·
27132086 (1) ·
27150311 (1) ·
27385877 (1) ·
27512287 (1) ·
27512302 (1) ·
27580021 (1) ·
28003795 (1) ·
28004740 (1) ·
28242068 (1) ·
28515436 (1) ·
28543436 (1) ·
28544228 (1) ·
29031702 (1)
80043190 (1) ·
80055370 (1) ·
80060834 (1) ·
80060838 (1) ·
80070400 (1) ·
80085370 (1) ·
80085830 (1) ·
80090063 (1) ·
80090683 (1) ·
80092461 (1) ·
80120027 (1) ·
80133779 (1) ·
80135221 (1) ·
80135984 (1) ·
80153061 (1) ·
80174730 (1) ·
80175381 (1) ·
80232401 (1) ·
80312618 (1) ·
80312721 (1) ·
80325084 (1) ·
80355219 (1) ·
80372030 (1) ·
80413919 (1) ·
80543046 (1) ·
80544759 (1) ·
81184073 (1) ·
81205307 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 28 results in range #1 to #28.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)