Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'SR-91 (Fla. Turnpike) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'EB 706 To SB I-95 ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'Indiantown Rd. ' (1) ·
'Lake Worth Road ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SR-76 ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1)
890121 (1) ·
890122 (1) ·
890127 (1) ·
890129 (1) ·
930372 (1) ·
930374 (1) ·
930384 (1) ·
930386 (1) ·
930387 (1) ·
930413 (1) ·
934313 (1) ·
934345 (1) ·
934925 (1) ·
934926 (1)
'.25 mi East of I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'South of Ramp to SR 706 ' (1) ·
'South of St Lucie Canal ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
'Tpk. / SR 706 Interchange' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)