Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'CANAL L-12 ' (1) ·
'DANFORTH CREEK ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Loxahatchee Slough ' (1) ·
'Nova Canal ' (1) ·
'PERENNIAL CANAL ' (1) ·
'Platt Ranch Access Road ' (1) ·
'Reed Canal ' (1) ·
'SB I-95 To EB 706 ' (1) ·
'SR 91 TPK ' (1) ·
'SW FORK LOXAHATCHEE RVR ' (1)
'AUDUBON CSWY ' (1) ·
'Bellevue Avenue ' (1) ·
'CENTRAL BLVD ' (1) ·
'CR 76A ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'Lantern Park Drive' (1) ·
'LEIGHTON FARM AVE ' (1) ·
'NW 2ND ST ' (1) ·
'PARK COMMERCE BLVD' (1) ·
'PGA Blvd (SR786) ' (1) ·
'SR-80 EB ' (1) ·
'SR-80 WB ' (1) ·
'St. Johns Heritage' (1) ·
'WB 706 To SB I-95 ' (1) ·
'Woodcliff Drive ' (1)
704190 (1) ·
790241 (1) ·
795001 (1) ·
796549 (1) ·
890114 (1) ·
894038 (1) ·
930354 (1) ·
930355 (1) ·
930360 (1) ·
930376 (1) ·
930381 (1) ·
930392 (1) ·
930419 (1) ·
930557 (1) ·
936451 (1) ·
936500 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.3MI N of SR-706 ' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.6MI South of CR-714 ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'10ft. East of Nova Road ' (1) ·
'16Mi W of SR-7 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'CR 76A over I-95 ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'I 95 SR 706 interchange ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
No deficiencies (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)