Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-1 Canal ' (1) ·
'Cambridge Canal ' (1) ·
'CANAL L-12 ' (1) ·
'Cypress Creek ' (1) ·
'Header Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Lateral A Canal ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'Military Trail ' (1) ·
'Okeechobee Waterway ' (1) ·
'SB I-95 To EB 706 ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'SW FORK LOXAHATCHEE RVR ' (1) ·
'US 92 ' (1) ·
Addison Canal (1)
'33rd Street ' (1) ·
'Central Blvd ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR-714 Indian St. ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 Ramp B ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'Palm Bay Parkway ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-80 EB ' (1) ·
'SR786 WB to SB I95' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'Trailwood Drive ' (1) ·
'WB 706 To SB I-95 ' (1) ·
'WB SR 70 ' (1) ·
I-95 (1)
700229 (1) ·
705924 (1) ·
790248 (1) ·
796414 (1) ·
884100 (1) ·
884104 (1) ·
890115 (1) ·
890116 (1) ·
894062 (1) ·
930355 (1) ·
930375 (1) ·
930376 (1) ·
930378 (1) ·
930379 (1) ·
930388 (1) ·
930392 (1) ·
931013 (1) ·
934369 (1) ·
940119 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.25 mile North of SR 786' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.3MI N of SR-706 ' (1) ·
'1 mile North of SR 786 ' (1) ·
'1.7 miles North of SR 706' (1) ·
'16Mi W of SR-7 ' (1) ·
'2.5 miles North of SR-706' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'I 95 SR 706 interchange ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'I-4 Connector over US-92 ' (1) ·
'Palm Beach Garden Interch' (1) ·
I-95 over Addison Canal (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)