Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 CANAL ' (1) ·
'CANAL L-12 ' (1) ·
'CANAL-17 ' (1) ·
'CR 708 ' (1) ·
'Drainage Canal ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I-95 (SR 9) ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'PERENNIAL CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'St. Lucie Canal/SR-76 ' (1)
'CR 76A ' (1) ·
'CR708 125.4 ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'FOREST HILL BLVD. ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NW 2ND ST ' (1) ·
'Old Dixie Highway ' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'PARK COMMERCE BLVD' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR-710 EB ' (1) ·
'SR-80 WB ' (1)
890114 (1) ·
890117 (1) ·
890118 (1) ·
890119 (1) ·
890130 (1) ·
890131 (1) ·
890161 (1) ·
930354 (1) ·
930359 (1) ·
930360 (1) ·
930381 (1) ·
930419 (1) ·
934213 (1) ·
934907 (1) ·
934909 (1) ·
934915 (1) ·
934916 (1) ·
936500 (1)
'0.1 MILE WEST OF I-95 ' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1 mi. N of Cnty Rd 708 ' (1) ·
'16Mi W of SR-7 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'CR 76A over I-95 ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)