Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal ' (1) ·
'CANAL-17 ' (1) ·
'CR 708 ' (1) ·
'DANFORTH CREEK ' (1) ·
'E-1 Canal ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-3 Canal ' (1) ·
'Eau Gallie River ' (1) ·
'Header Canal ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LEVEE NO. 8 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR 91 TPK ' (1)
'CR708 125.4 ' (1) ·
'Croton Road ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'EAST OCEAN AVE. ' (1) ·
'Forest Hill Blvd. ' (1) ·
'LEIGHTON FARM AVE ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NW 2ND ST ' (1) ·
'Old Dixie Highway ' (1) ·
'PALOMINO DRIVE ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'Shop Ctr Entrance ' (1) ·
'SR-808 Glades Road' (1) ·
'SR-80EB (Southern)' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'WB SR 70 ' (1)
704176 (1) ·
790164 (1) ·
790165 (1) ·
890117 (1) ·
890118 (1) ·
890119 (1) ·
894038 (1) ·
930359 (1) ·
930360 (1) ·
930381 (1) ·
930408 (1) ·
930412 (1) ·
930414 (1) ·
930415 (1) ·
930416 (1) ·
930419 (1) ·
934327 (1) ·
934328 (1) ·
934329 (1) ·
934347 (1) ·
940119 (1)
'0.1 MILE WEST OF I-95 ' (1) ·
'0.2 Mile S of Aurora Road' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.6MI South of CR-714 ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'0.8MI N OF LAKEWORTH BLVD' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1200ft. N. of SR-400 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'800ft. N. of SR-400 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1)
26220391 (1) ·
26220396 (1) ·
26220464 (1) ·
26221756 (1) ·
26350275 (1) ·
26374169 (1) ·
26390331 (1) ·
26390702 (1) ·
26410616 (1) ·
26411370 (1) ·
26490300 (1) ·
26525829 (1) ·
26525885 (1) ·
27023771 (1) ·
27023878 (1) ·
27023967 (1) ·
27091740 (1) ·
27222475 (1) ·
28075785 (1) ·
29103958 (1) ·
29104333 (1)
80023162 (1) ·
80045519 (1) ·
80074322 (1) ·
80075174 (1) ·
80075197 (1) ·
80101354 (1) ·
80101495 (1) ·
80101504 (1) ·
80101677 (1) ·
80121068 (1) ·
80121445 (1) ·
80140214 (1) ·
80140445 (1) ·
80142214 (1) ·
80180837 (1) ·
80215065 (1) ·
80295022 (1) ·
80391820 (1) ·
80401144 (1) ·
81014276 (1) ·
81014315 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)