Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'C-51 Canal ' (1) ·
'DRAINAGE CANAL ' (1) ·
'Header Creek Canal ' (1) ·
'I-4 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'KRUEGER CREEK ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Ten Mile Creek ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
Sebastian River (1)
'Benoist Farms Rd ' (1) ·
'CR-4139 ' (1) ·
'CR-880 ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'EB SR 70 ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'Orange camp Rd. ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR 70 EB ' (1) ·
'SR 710 ' (1) ·
'SR A1A ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR-91 TPK NS 81.77' (1) ·
US-1 (1)
700224 (1) ·
790211 (1) ·
790212 (1) ·
890107 (1) ·
890120 (1) ·
930351 (1) ·
930373 (1) ·
930534 (1) ·
931006 (1) ·
934711 (1) ·
934905 (1) ·
934940 (1) ·
940154 (1) ·
940156 (1) ·
940158 (1) ·
944016 (1)
'.75 miles South of SR-882' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'2MI E of SR-76 ' (1) ·
'3.9 MI W of FL Tpk SR 91 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'7 MI W of FL TPK SR91 ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'CR-4139 over I-4 ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
US-1 over Sebastian River (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)