Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL C-108 ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'DRAINAGE CANAL ' (1) ·
'George King Blvd ' (1) ·
'Goat Creek ' (1) ·
'Header Canal ' (1) ·
'Indian River IWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-5 Canal ' (1) ·
'Lake Ashby Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
George King Blvd (1)
'CR-68 (Orange Ave)' (1) ·
'CR-880 ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'JORGENSEN RD ' (1) ·
'Levee Road ' (1) ·
'Maytown Road ' (1) ·
'NORTH MACEDO BLVD ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SELVITZ RD. ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-A1A NB ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'SR91SB ON/OFF 98.0' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-192 EB ' (1) ·
SR-A1A SB (1)
700181 (1) ·
700204 (1) ·
700205 (1) ·
700210 (1) ·
700211 (1) ·
794139 (1) ·
794141 (1) ·
890107 (1) ·
930351 (1) ·
930450 (1) ·
930804 (1) ·
931005 (1) ·
934905 (1) ·
934940 (1) ·
944015 (1) ·
945252 (1) ·
945253 (1) ·
945254 (1)
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI N OF NW BAYSHORE BL' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'4MI W OF FL TRNPK ' (1) ·
'500' N OF SR-80 (S.BLVD) ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
'US-1 NB over Goat Creek ' (1) ·
'US-1 SB over Goat Creek ' (1) ·
'US-192 EB - Indian River ' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)