Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER C-25 CANAL ' (1) ·
'CANAL C-108 ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'DRAINAGE CANAL ' (1) ·
'E-1 Canal ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'I-4 ' (1) ·
'Indian River IWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'KRUEGER CREEK ' (1) ·
'L-6 Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'Rose Bay ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'SR-710 ' (1) ·
'Tillman Canal ' (1) ·
'Tomoka River ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'CR-880 ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'Hypoluxo Rd ' (1) ·
'JORGENSEN RD ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'LYONS ROAD ' (1) ·
'Minton Road CR-509' (1) ·
'NB SR-615 ' (1) ·
'NORTH MACEDO BLVD ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SB SR- 615 ' (1) ·
'SELVITZ RD. ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-472 WB ' (1) ·
'SR-715 ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR-807 Congress Av' (1) ·
'U.S.-1 (SR-5) ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-192 EB ' (1) ·
'US-1SB ' (1)
700181 (1) ·
704075 (1) ·
790155 (1) ·
790157 (1) ·
790159 (1) ·
790162 (1) ·
790186 (1) ·
790190 (1) ·
890107 (1) ·
890120 (1) ·
930351 (1) ·
930373 (1) ·
930466 (1) ·
930470 (1) ·
930471 (1) ·
934362 (1) ·
934905 (1) ·
934940 (1) ·
934956 (1) ·
940148 (1) ·
940149 (1) ·
944014 (1) ·
945252 (1) ·
945253 (1) ·
945254 (1)
'.75 miles South of SR-882' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI N OF NW BAYSHORE BL' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2MI E of SR-76 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'At ANGLE RD(CR-607A) ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'Port of Palm Beach ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 NB over Rose Bay ' (1) ·
'US-1 SB - Spruce Creek ' (1) ·
'US-1 SB-Spruce Creek ' (1) ·
'US-192 EB - Indian River ' (1) ·
'US-1SB - Spruce Cr. S. ' (1)
26240578 (1) ·
26252613 (1) ·
26295449 (1) ·
26341358 (1) ·
26383999 (1) ·
26394300 (1) ·
26404182 (1) ·
26413800 (1) ·
26460153 (1) ·
27035280 (1) ·
27115100 (1) ·
27201582 (1) ·
27201586 (1) ·
27201587 (1) ·
27281131 (1) ·
27283525 (1) ·
27283630 (1) ·
28004932 (1) ·
28050237 (1) ·
28571929 (1) ·
29050202 (1) ·
29051082 (1) ·
29051903 (1) ·
29061326 (1) ·
29181868 (1)
80031952 (1) ·
80032221 (1) ·
80051800 (1) ·
80072029 (1) ·
80075212 (1) ·
80111481 (1) ·
80120021 (1) ·
80121946 (1) ·
80135670 (1) ·
80205848 (1) ·
80205926 (1) ·
80213056 (1) ·
80215969 (1) ·
80222500 (1) ·
80225738 (1) ·
80270492 (1) ·
80352939 (1) ·
80401977 (1) ·
80410200 (1) ·
80580163 (1) ·
80580732 (1) ·
80581203 (1) ·
80581835 (1) ·
81053827 (1) ·
81152767 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)