Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
None (1) ·
30975 (1) ·
54175 (1) ·
58725 (1) ·
Cocoa (1) ·
Fellsmere (1) ·
Holly Hill (1) ·
Juno Beach (1) ·
Lake Worth (1) ·
Lantana (1) ·
Melbourne (1) ·
Mims (1)
'11th Street Canal ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'CANAL C-108 ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'DRAINAGE CANAL ' (1) ·
'Indian River IWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Lake Ashby Canal ' (1) ·
'LATERAL U CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'St Johns River ' (1) ·
Six Mile Creek (1)
'Alta Drive ' (1) ·
'CR-512 ' (1) ·
'CR-880 ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'DONALD ROSS RD WB ' (1) ·
'JORGENSEN RD ' (1) ·
'Maytown Road ' (1) ·
'NORTH MACEDO BLVD ' (1) ·
'OKEELANTA RD. ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SELVITZ RD. ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-520 WB ' (1) ·
'SR-714 ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'US-192 EB ' (1) ·
'US-98 SR700 US441 ' (1) ·
SR-46 (1)
700181 (1) ·
700194 (1) ·
700200 (1) ·
794139 (1) ·
794141 (1) ·
795503 (1) ·
884067 (1) ·
884068 (1) ·
890107 (1) ·
890159 (1) ·
930351 (1) ·
930465 (1) ·
931002 (1) ·
931003 (1) ·
934160 (1) ·
934522 (1) ·
934905 (1) ·
934940 (1) ·
945252 (1) ·
945253 (1) ·
945254 (1)
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI N OF NW BAYSHORE BL' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'At LPGA Blvd. ' (1) ·
'AT US-27 ' (1) ·
'SR-520 WB -St Johns River' (1) ·
'SR-700 CANAL POINT ' (1) ·
'Turnpike at Stuart exit. ' (1) ·
'US-192 EB - Indian River ' (1) ·
SR-46 over Six Mile Cr (1)
26240578 (1) ·
26295449 (1) ·
26352544 (1) ·
26352545 (1) ·
26363600 (1) ·
26404182 (1) ·
26514900 (1) ·
26525529 (1) ·
27035280 (1) ·
27094100 (1) ·
27201582 (1) ·
27201586 (1) ·
27201587 (1) ·
27442320 (1) ·
27454113 (1) ·
28050237 (1) ·
28221061 (1) ·
28395620 (1) ·
28504614 (1) ·
28504680 (1) ·
29143549 (1)
80040992 (1) ·
80072029 (1) ·
80075212 (1) ·
80102377 (1) ·
80102433 (1) ·
80120021 (1) ·
80181600 (1) ·
80213056 (1) ·
80215969 (1) ·
80222500 (1) ·
80270492 (1) ·
80352939 (1) ·
80365199 (1) ·
80375380 (1) ·
80383118 (1) ·
80424015 (1) ·
80522244 (1) ·
80543618 (1) ·
81025160 (1) ·
81044532 (1) ·
81060638 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.