Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'Clint Moore Road ' (1) ·
'CSX-RR ' (1) ·
'I 95 and SR 704 ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'RELIEF CANAL ' (1) ·
'Salerno Creek ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N. Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'Ten Mile Creek ' (1) ·
'Tomoka River ' (1) ·
'Troup Indiantown Canal ' (1)
'CR726(CITRUS BLVD)' (1) ·
'GRANDVIEW WAY ' (1) ·
'Haverhill Rd ' (1) ·
'Lantana Road ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Park Road ' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SR-44 ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'WB SR-70 ' (1) ·
'WB SR704 to SB I95' (1)
790156 (1) ·
790158 (1) ·
790160 (1) ·
790176 (1) ·
790185 (1) ·
890110 (1) ·
890111 (1) ·
894053 (1) ·
894055 (1) ·
930469 (1) ·
930801 (1) ·
931000 (1) ·
934359 (1) ·
934365 (1) ·
934366 (1) ·
937362 (1) ·
937366 (1) ·
940120 (1)
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'SR-44 over CSX-RR ' (1) ·
'US-1 NB - Spruce Cr. S. ' (1) ·
'US-1 NB - Spruce Creek ' (1) ·
'US-1 SB - Tomoka River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.