Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Briar Creek Blvd. ' (1) ·
'COLUMBUS DR. ' (1) ·
'DARWIN BLVD ' (1) ·
'Fort Florida Road ' (1) ·
'GETTYSBURG DR ' (1) ·
'GRANDVIEW WAY ' (1) ·
'JEANNE AVE ' (1) ·
'KESTOR DR ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'PAAR DR ' (1) ·
'PAAR DR. ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'S. VERDE TRAIL ' (1) ·
'SAVAGE BLVD. ' (1) ·
'SAVONA BLVD. ' (1) ·
'UNDALLO RD ' (1)
705500 (1) ·
794162 (1) ·
934903 (1) ·
937362 (1) ·
937366 (1) ·
945255 (1) ·
945257 (1) ·
945258 (1) ·
945259 (1) ·
945260 (1) ·
945261 (1) ·
945262 (1) ·
945263 (1) ·
945264 (1) ·
945265 (1) ·
945266 (1) ·
945267 (1)
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI E OF DARWIN BLVD ' (1) ·
'0.3MI W of DARWIN BLVD. ' (1) ·
'0.4MI S OF PAAR DRIVE ' (1) ·
'0.4MI W OF PORT ST LUCIE ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'0.8MI N OF SW BECKER RD ' (1) ·
'0.9MI S OF PAAR DRIVE ' (1) ·
'1.2MI W OF PORT ST. LUCIE' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'At S Military Trail ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)