Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'C-17 Canal ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'Danforth Creek ' (1) ·
'E-1 Canal ' (1) ·
'Halifax River IWW ' (1) ·
'I-4 ' (1) ·
'Lake Ashby Canal ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'Reed Canal ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Ten Mile Creek ' (1) ·
'WPB WATER SUPPLY CANAL ' (1)
'Benoist Farms Rd ' (1) ·
'Berry Avenue ' (1) ·
'CITRUS BLVD. ' (1) ·
'CR-4139 ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'Lake Ashby Road ' (1) ·
'MURPHY RD ' (1) ·
'Orange camp Rd. ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'SR 710 ' (1) ·
'SR A1A ' (1) ·
'SR-40 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SW 48th Avenue ' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD ' (1)
790132 (1) ·
790211 (1) ·
790212 (1) ·
794146 (1) ·
796500 (1) ·
890103 (1) ·
890112 (1) ·
894054 (1) ·
894060 (1) ·
894061 (1) ·
930401 (1) ·
930534 (1) ·
931006 (1) ·
934711 (1) ·
937712 (1) ·
937714 (1) ·
940158 (1) ·
944016 (1)
'0.1 Mile S of CR-714 ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.8MI S OF 45TH ST CR702 ' (1) ·
'0.8mi. N of CR-714 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'200ft. East of SR-415 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'CR-4139 over I-4 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)