Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'Canoe Creek ' (1) ·
'Danforth Creek ' (1) ·
'E-2W CANAL ' (1) ·
'E3-canal ' (1) ·
'East Indian River Relief' (1) ·
'Holly Drive ' (1) ·
'I 95 SR 9 ' (1) ·
'ICWW ' (1) ·
'Lake Ashby Canal ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'SR-40 ' (1) ·
'West Indian River Relief' (1)
'East Island Access' (1) ·
'I-95 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Lake Ashby Road ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'Melaleuca Lane ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'Spanish River Blvd' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 SB OFF RP81.9' (1) ·
'SR91 SB ON RP 81.9' (1) ·
'WB SR - 714 ' (1) ·
'WB US 98 SR 80 ' (1) ·
'West Island Access' (1)
790193 (1) ·
794146 (1) ·
890135 (1) ·
890148 (1) ·
890149 (1) ·
890150 (1) ·
930462 (1) ·
930510 (1) ·
930517 (1) ·
931007 (1) ·
931008 (1) ·
931009 (1) ·
934179 (1) ·
934361 (1) ·
935223 (1)
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.25 Mile N of Center St.' (1) ·
'0.3Mi E of Military Trail' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'200ft. East of SR-415 ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'I-95 over SR-40 ' (1) ·
'NW Quad I-95/6th Ave S ' (1) ·
'SR 80 / I-95 interchange ' (1) ·
'West of Ernest Lyons Bri.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
114510 (1) ·
12666 (1) ·
157712 (1) ·
18218 (1) ·
18500 (1) ·
208 (1) ·
25331 (1) ·
297552 (1) ·
30796 (1) ·
31199 (1) ·
49014 (1) ·
5040 (1) ·
5552 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)