Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'Danforth Creek ' (1) ·
'E-1 Canal ' (1) ·
'E3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Halifax River IWW ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'Lake Ashby Canal ' (1) ·
'LIPTOG CANAL ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'SR-76 & St. Lucie Canal ' (1)
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'DYER PARK ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'Lake Ashby Road ' (1) ·
'LAKE IDA ROAD ' (1) ·
'McClure Road ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PINE RIDGE WAY ' (1) ·
'PROSPERITY FARM RD' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR-40 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
790132 (1) ·
794146 (1) ·
890103 (1) ·
890135 (1) ·
894051 (1) ·
930401 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934357 (1) ·
934951 (1) ·
934964 (1) ·
934965 (1) ·
936701 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'200ft. East of SR-415 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26281579 (1) ·
26281595 (1) ·
26322077 (1) ·
26364799 (1) ·
26413216 (1) ·
26433224 (1) ·
26435320 (1) ·
26435409 (1) ·
26440062 (1) ·
26440066 (1) ·
26470845 (1) ·
26481006 (1) ·
26483417 (1) ·
26483495 (1) ·
26512989 (1) ·
26562633 (1) ·
26562955 (1) ·
26590720 (1) ·
27062187 (1) ·
27102072 (1) ·
28563087 (1) ·
29171420 (1)
80041852 (1) ·
80045351 (1) ·
80051796 (1) ·
80053153 (1) ·
80053241 (1) ·
80060815 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80075060 (1) ·
80075215 (1) ·
80075217 (1) ·
80084971 (1) ·
80092158 (1) ·
80121129 (1) ·
80133989 (1) ·
80134000 (1) ·
80161373 (1) ·
80161911 (1) ·
80370127 (1) ·
80402996 (1) ·
81030614 (1) ·
81060951 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)