Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C STANLEY WEAVER CANAL ' (1) ·
'CANAL ' (1) ·
'Danforth Creek ' (1) ·
'E-1 Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'Halifax River IWW ' (1) ·
'I-95 ' (1) ·
'L-5 Canal ' (1) ·
'Lake Ashby Canal ' (1) ·
'LIPTOG CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'CAMINO REAL ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'Lake Ashby Road ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'NB US-27 SR-25 ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Port St. Lucie Bld' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR-40 ' (1) ·
'SR-520 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'TROPICALIA AVE. ' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
700193 (1) ·
790132 (1) ·
790171 (1) ·
794146 (1) ·
884056 (1) ·
890103 (1) ·
890135 (1) ·
894050 (1) ·
894052 (1) ·
930353 (1) ·
930401 (1) ·
934240 (1) ·
934950 (1) ·
934960 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1) ·
940142 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'200ft. East of SR-415 ' (1) ·
'250ft North of SR-60 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Palm Beach - Broward Line' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.