Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'C-15 Canal ' (1) ·
'CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'E-1 Canal ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Halifax River IWW ' (1) ·
'I-4 ' (1) ·
'LIPTOG CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'Reed Canal ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
Indian River Relief East (1)
'BOB W RD 130TH ST.' (1) ·
'BROWNS FARM/CR-827' (1) ·
'MURPHY RD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NW 27TH AVE. ' (1) ·
'PINE RIDGE WAY ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'Saxon Blvd WB ' (1) ·
'SB I 95 to Cong Av' (1) ·
'SR-40 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
SR-520 (1)
700196 (1) ·
790132 (1) ·
790166 (1) ·
796500 (1) ·
885810 (1) ·
890103 (1) ·
890112 (1) ·
930401 (1) ·
930444 (1) ·
930445 (1) ·
934488 (1) ·
934518 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1) ·
940143 (1) ·
945272 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.4Mi. North of SR-60 ' (1) ·
'0.85 mile South of Linton' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'5.7MI W OF US-1 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)