Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Canal ' (1) ·
'E-1 Canal ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-3 Canal ' (1) ·
'Halifax River IWW ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'LEVEE NO. 8 ' (1) ·
'LIPTOG CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'SR-9 (I-95) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB WATER SUPPLY CANAL ' (1)
'CENTRE PARK BLVD. ' (1) ·
'CENTRE PK. DR. N. ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'Forest Hill Blvd. ' (1) ·
'PALOMINO DRIVE ' (1) ·
'PINE RIDGE WAY ' (1) ·
'SR-40 ' (1) ·
'SR-76 ' (1) ·
'SR-76 (Kanner Hwy)' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-808 Glades Road' (1) ·
'SR-80EB (Southern)' (1) ·
'St Lucie West Blvd' (1) ·
'US-27 (SR-25) ' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
790132 (1) ·
890103 (1) ·
890135 (1) ·
890141 (1) ·
890142 (1) ·
930342 (1) ·
930401 (1) ·
930408 (1) ·
930414 (1) ·
930415 (1) ·
934327 (1) ·
934328 (1) ·
934329 (1) ·
934347 (1) ·
937710 (1) ·
937711 (1) ·
937712 (1) ·
937714 (1) ·
937715 (1) ·
937716 (1) ·
940133 (1)
'.25 Mi E of AUSTRALIAN ' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.8MI N OF LAKEWORTH BLVD' (1) ·
'0.8MI S OF 45TH ST CR702 ' (1) ·
'1.5mi East of Indiantown' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-27 OVER BOLLES CANAL ' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26220391 (1) ·
26220396 (1) ·
26350275 (1) ·
26363478 (1) ·
26374169 (1) ·
26390331 (1) ·
26390702 (1) ·
26410616 (1) ·
26413718 (1) ·
26414389 (1) ·
26433224 (1) ·
26440062 (1) ·
26440066 (1) ·
26445867 (1) ·
26590720 (1) ·
27011358 (1) ·
27014124 (1) ·
27102072 (1) ·
27184103 (1) ·
29171420 (1)
80023162 (1) ·
80041853 (1) ·
80042221 (1) ·
80052862 (1) ·
80053153 (1) ·
80053241 (1) ·
80060815 (1) ·
80074322 (1) ·
80101354 (1) ·
80101677 (1) ·
80121068 (1) ·
80121129 (1) ·
80121445 (1) ·
80161373 (1) ·
80215065 (1) ·
80244814 (1) ·
80245322 (1) ·
80260193 (1) ·
80370127 (1) ·
80424182 (1) ·
81030614 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)