Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'CANAL C-24 ' (1) ·
'CR 709 & FECRR ' (1) ·
'Gatlin Blvd ' (1) ·
'I-95 ' (1) ·
'Lake Gertie ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E3 Canal ' (1) ·
'MAPLE CREEK ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'St Johns River Relief ' (1) ·
'ST LUCIE CANAL ' (1) ·
'US-17-92-St Johns River ' (1) ·
Horse Creek (1)
'1st St SW ' (1) ·
'5th Street ' (1) ·
'Belvede to NB I-95' (1) ·
'CONGRESS AVE ' (1) ·
'CR-612 8th Street ' (1) ·
'CR-92 EB ' (1) ·
'EB SR 786 ' (1) ·
'I-4 EB ' (1) ·
'Investment Lane ' (1) ·
'MAPP RD ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR-415 ' (1) ·
'SR-520 ' (1) ·
'SR-91 TPK NB 131.0' (1) ·
'W LAKE RD CR-717 ' (1) ·
'Woolbright Road ' (1) ·
US-1 (1)
700206 (1) ·
700208 (1) ·
790197 (1) ·
790198 (1) ·
794186 (1) ·
884069 (1) ·
884072 (1) ·
884073 (1) ·
891000 (1) ·
894033 (1) ·
930485 (1) ·
930491 (1) ·
934162 (1) ·
934491 (1) ·
934505 (1) ·
934989 (1) ·
940109 (1) ·
940115 (1) ·
940116 (1) ·
940126 (1) ·
940127 (1) ·
945251 (1)
'.75 Mile South Midway Rd.' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.4 Mile West of US 17-92' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.5 MI. W of Military Tr ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1st overpass east of I-95' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'At 58th Ave ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'North of Belvedere Rd ' (1) ·
'SR-415 - St Johns Relief ' (1) ·
'SR-520 - Banana River ' (1) ·
US-1 over Horse Creek (1)
26304669 (1) ·
26322160 (1) ·
26413700 (1) ·
26420225 (1) ·
26475245 (1) ·
26503600 (1) ·
27070395 (1) ·
27080035 (1) ·
27154364 (1) ·
27155060 (1) ·
27211679 (1) ·
27211974 (1) ·
27234232 (1) ·
27234592 (1) ·
27354128 (1) ·
27360764 (1) ·
27370020 (1) ·
28100028 (1) ·
28212680 (1) ·
28485599 (1) ·
28500676 (1) ·
29031634 (1)
80040300 (1) ·
80052654 (1) ·
80054600 (1) ·
80055517 (1) ·
80075312 (1) ·
80161820 (1) ·
80162916 (1) ·
80200930 (1) ·
80233923 (1) ·
80234014 (1) ·
80244973 (1) ·
80245174 (1) ·
80251811 (1) ·
80264839 (1) ·
80264892 (1) ·
80264917 (1) ·
80384071 (1) ·
80393654 (1) ·
80413808 (1) ·
81112589 (1) ·
81184077 (1) ·
81190878 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.