Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR 709 & FECRR ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Gatlin Blvd ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-30 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Ten Mile Creek ' (1) ·
'West Palm Beach Canal ' (1)
930349 (1) ·
930409 (1) ·
930410 (1) ·
934345 (1) ·
934925 (1) ·
934926 (1) ·
934936 (1) ·
934937 (1) ·
940108 (1) ·
940109 (1) ·
940113 (1) ·
940114 (1) ·
940115 (1) ·
940116 (1) ·
940122 (1) ·
940123 (1) ·
940126 (1) ·
940127 (1)
'.5 miles South of SR-70 ' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'SR-7 & SR-80 intersection' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.