Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CR 709 & FECRR ' (1) ·
'Danforth Creek ' (1) ·
'E-1 Canal ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Gatlin Blvd ' (1) ·
'Halifax River IWW ' (1) ·
'Lake Ashby Canal ' (1) ·
'LIPTOG CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SR-507 ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'Ten Mile Creek ' (1)
'CONGRESS AVE ' (1) ·
'Lake Ashby Road ' (1) ·
'MAPP RD ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PINE RIDGE WAY ' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR-40 ' (1) ·
'SR-507 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'W LAKE RD CR-717 ' (1) ·
'WB SR - 714 ' (1)
700186 (1) ·
790132 (1) ·
794146 (1) ·
890103 (1) ·
890135 (1) ·
894033 (1) ·
930401 (1) ·
934491 (1) ·
934505 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1) ·
940108 (1) ·
940109 (1) ·
940113 (1) ·
940114 (1) ·
940115 (1) ·
940116 (1) ·
940122 (1) ·
940123 (1) ·
940126 (1) ·
940127 (1) ·
945251 (1)
'.5 miles South of SR-70 ' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'200ft. East of SR-415 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-507 over Crane Creek ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26322160 (1) ·
26420225 (1) ·
26433224 (1) ·
26435320 (1) ·
26435409 (1) ·
26440062 (1) ·
26440066 (1) ·
26590720 (1) ·
27080035 (1) ·
27102072 (1) ·
27154364 (1) ·
27155060 (1) ·
27155288 (1) ·
27171853 (1) ·
27172347 (1) ·
27211679 (1) ·
27211974 (1) ·
27234232 (1) ·
27234592 (1) ·
27240492 (1) ·
27241193 (1) ·
28040738 (1) ·
28563087 (1) ·
29171420 (1)
80052654 (1) ·
80053153 (1) ·
80053241 (1) ·
80060815 (1) ·
80121129 (1) ·
80133989 (1) ·
80134000 (1) ·
80161373 (1) ·
80161820 (1) ·
80200930 (1) ·
80231981 (1) ·
80232174 (1) ·
80233923 (1) ·
80234014 (1) ·
80244973 (1) ·
80245174 (1) ·
80251481 (1) ·
80251602 (1) ·
80251811 (1) ·
80252110 (1) ·
80370127 (1) ·
80371675 (1) ·
80413808 (1) ·
81030614 (1) ·
81060951 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)