Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C-37 Canal ' (1) ·
'Canal ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'N Fork Loxahatchee River' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'Rio Mar Bay ' (1) ·
'South Relief Canal ' (1)
'5th Street SW ' (1) ·
'Bay Drive ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'CR605 Old Dixie ' (1) ·
'Island Drive ' (1) ·
'JUPITER BEACH RD ' (1) ·
'Jupiter Boulevard ' (1) ·
'LE CHALET BLVD ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'River Drive ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SW 18TH ST ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 (SR-5) ' (1)
705923 (1) ·
880089 (1) ·
884085 (1) ·
884086 (1) ·
885811 (1) ·
885812 (1) ·
934125 (1) ·
934135 (1) ·
934487 (1) ·
935218 (1) ·
936656 (1) ·
936776 (1) ·
940035 (1) ·
940111 (1) ·
940112 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.1 Mile West of A1A ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'1MI W of US-1 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'5th St. SW at CR-611 ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'I-95 over Midway Road ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)