Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C-51 Canal ' (1) ·
'Cabana Colony Circle ' (1) ·
'CR 702 45th Street ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'WPB CANAL C-51 ' (1)
930322 (1) ·
930458 (1) ·
930460 (1) ·
930511 (1) ·
930519 (1) ·
930520 (1) ·
930527 (1) ·
930530 (1) ·
934125 (1) ·
934135 (1) ·
934178 (1) ·
934487 (1) ·
934751 (1) ·
935218 (1)
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'1 mile North of SR 704 ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'2 miles west of Turnpike ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'SR-80 & Military Trail ' (1)
10500 (1) ·
106500 (1) ·
18700 (1) ·
2000 (1) ·
20500 (1) ·
213000 (1) ·
232000 (1) ·
43000 (1) ·
70815 (1) ·
8800 (1) ·
9000 (1) ·
9500 (1) ·
9900 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
122864 (1) ·
15268 (1) ·
15615 (1) ·
16482 (1) ·
17176 (1) ·
18218 (1) ·
184778 (1) ·
2500 (1) ·
26400 (1) ·
32445 (1) ·
369555 (1) ·
402520 (1) ·
74605 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)