Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL ' (1) ·
'BRANCH OF ICWW ' (1) ·
'CANAL E-4 ' (1) ·
'Canal No. 1 (Rim Canal) ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'E3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'ELKCAM CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'JONES CREEK ' (1) ·
'KELLER CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Murray Creek ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'WPB Canal (C-51) ' (1)
'AIROSO BLVD. ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'CENTER STREET ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'DYER PARK ROAD ' (1) ·
'Forest Hill Blvd. ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LAKE IDA ROAD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'McClure Road ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PROSPERITY FARM RD' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SW 18TH ST ' (1) ·
'US-1 ' (1)
790181 (1) ·
894051 (1) ·
930322 (1) ·
930446 (1) ·
934125 (1) ·
934135 (1) ·
934137 (1) ·
934140 (1) ·
934146 (1) ·
934147 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934357 (1) ·
934487 (1) ·
934951 (1) ·
934964 (1) ·
934965 (1) ·
935218 (1) ·
936701 (1) ·
940035 (1) ·
940111 (1) ·
940112 (1) ·
944013 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.6MI Nof PT ST LUCIE BLD' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1MI SW OF US-441 ' (1) ·
'1MI W of US-1 ' (1) ·
'4.3 Mi North of SR-44 ' (1) ·
'I-95 over Midway Road ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'Just west of I-95 ' (1)
26194915 (1) ·
26262317 (1) ·
26281579 (1) ·
26281595 (1) ·
26322077 (1) ·
26331032 (1) ·
26364799 (1) ·
26391800 (1) ·
26413216 (1) ·
26470845 (1) ·
26481006 (1) ·
26483417 (1) ·
26483495 (1) ·
26512989 (1) ·
26524856 (1) ·
26561862 (1) ·
26562633 (1) ·
26562955 (1) ·
27062187 (1) ·
27173773 (1) ·
27222697 (1) ·
27222772 (1) ·
27222932 (1) ·
29044616 (1)
80035475 (1) ·
80041600 (1) ·
80041852 (1) ·
80042000 (1) ·
80043160 (1) ·
80045351 (1) ·
80051796 (1) ·
80054858 (1) ·
80070561 (1) ·
80071243 (1) ·
80071351 (1) ·
80075060 (1) ·
80075125 (1) ·
80075215 (1) ·
80075217 (1) ·
80084971 (1) ·
80092158 (1) ·
80161911 (1) ·
80203293 (1) ·
80205857 (1) ·
80243196 (1) ·
80243677 (1) ·
80402996 (1) ·
80572087 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)