Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'E-1 CANAL ' (1) ·
'E-2-W canal ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'N CANAL ' (1) ·
'Over D Canal ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 91 TPK ' (1) ·
'TIDAL CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'Boynton Bch Blvd ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'HAVERHILL ROAD ' (1) ·
'HOOD RD 110.944 ' (1) ·
'INDIAN STREET ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SIMARA STREET ' (1) ·
'SR91 N/S TPK 86.95' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'SW 18TH ST ' (1) ·
'Tangerine Drive ' (1) ·
'VANDEGRIFT-WILL RD' (1)
894040 (1) ·
895504 (1) ·
930322 (1) ·
930428 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930438 (1) ·
930441 (1) ·
930448 (1) ·
930449 (1) ·
930800 (1) ·
934125 (1) ·
934135 (1) ·
934256 (1) ·
934487 (1) ·
934506 (1) ·
934922 (1) ·
934923 (1) ·
935218 (1) ·
940111 (1) ·
940112 (1)
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'BOYNTON BCH EAST OF TPK ' (1) ·
'BOYNTON BCH WEST OF TPK ' (1) ·
'I-95 over Midway Road ' (1)
26194915 (1) ·
26212592 (1) ·
26212629 (1) ·
26262317 (1) ·
26312802 (1) ·
26313526 (1) ·
26313548 (1) ·
26314057 (1) ·
26314099 (1) ·
26314182 (1) ·
26314200 (1) ·
26315179 (1) ·
26331032 (1) ·
26410304 (1) ·
26442375 (1) ·
26450216 (1) ·
26515528 (1) ·
26524856 (1) ·
26561862 (1) ·
27102110 (1) ·
27111660 (1) ·
27222697 (1) ·
27222932 (1)
80035475 (1) ·
80042000 (1) ·
80043160 (1) ·
80054858 (1) ·
80070375 (1) ·
80074430 (1) ·
80075125 (1) ·
80075210 (1) ·
80101941 (1) ·
80101974 (1) ·
80101977 (1) ·
80102132 (1) ·
80102271 (1) ·
80102293 (1) ·
80102313 (1) ·
80112090 (1) ·
80121064 (1) ·
80121067 (1) ·
80123610 (1) ·
80162939 (1) ·
80243196 (1) ·
80243677 (1) ·
80321756 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)