Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C-51 CANAL ' (1) ·
'CYPRESS CREEK ' (1) ·
'DANFORTH CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Jupiter Creek ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'RCA CANAL ' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'CR-712 (MIDWAY RD)' (1) ·
'CR-713 ' (1) ·
'DIXIE HIGHWAY ' (1) ·
'FLYING COW ROAD ' (1) ·
'Indiantown Road ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'NW 7TH STREET ' (1) ·
'PALMWOOD ROAD ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'Sea Ray Drive ' (1) ·
'SW 18TH ST ' (1)
704144 (1) ·
890113 (1) ·
894009 (1) ·
930322 (1) ·
930420 (1) ·
934125 (1) ·
934135 (1) ·
934136 (1) ·
934139 (1) ·
934292 (1) ·
934483 (1) ·
934487 (1) ·
935218 (1) ·
935221 (1) ·
940035 (1)
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.2MI SOUTH OF CR-714 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'1MI W of US-1 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'AT SR-80 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)