Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Crane Creek Canal ' (1) ·
'Drainage Canal ' (1) ·
'E 3.5 AIRPORT CANAL ' (1) ·
'E-2 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'Horse Creek ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Sebastian Canal ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Taylor Creek ' (1) ·
'WILLOUGHBY CREEK ' (1)
'Babcock Street ' (1) ·
'BISCAYNE DRIVE ' (1) ·
'CHERRY ROAD ' (1) ·
'CR-76A ' (1) ·
'Croton Road ' (1) ·
'Dunn Avenue ' (1) ·
'HARRIS RD ' (1) ·
'Hatton Road ' (1) ·
'HURON WAY ' (1) ·
'John Rhodes Blvd. ' (1) ·
'Juanita Ave. ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'Old Dixie Highway ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'Service Road ' (1) ·
'US 192 WB ' (1) ·
'US-192 EB ' (1)
700233 (1) ·
700234 (1) ·
704042 (1) ·
704102 (1) ·
704189 (1) ·
794123 (1) ·
794124 (1) ·
794189 (1) ·
890093 (1) ·
890102 (1) ·
894047 (1) ·
894048 (1) ·
934229 (1) ·
934515 (1) ·
934517 (1) ·
934552 (1) ·
934904 (1) ·
935750 (1) ·
944017 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1Mi W of US-1 ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'0.4 MILE EAST OF SR-809 ' (1) ·
'0.4 Miles No of US-192 ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'1.7 Miles N of Aurora Rd.' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'AT TEDDAR ROAD ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-192 EB - Indian Riv ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)