Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal / Trib 1 ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'C-37 Canal ' (1) ·
'Canal ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Drainage Canal ' (1) ·
'E-3 CANAL ' (1) ·
'Indian River ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'M CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Rio Mar Bay ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'South Relief Canal ' (1) ·
'Spruce Creek ' (1) ·
'ST LUCIE CANAL ' (1) ·
'US-1 & FECRR ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'5th Street SW ' (1) ·
'Bay Drive ' (1) ·
'BISCAYNE DRIVE ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-4009 ' (1) ·
'CR-76A ' (1) ·
'CR605 Old Dixie ' (1) ·
'Esplanade Avenue ' (1) ·
'HARRIS RD ' (1) ·
'HURON WAY ' (1) ·
'Jupiter Boulevard ' (1) ·
'LAWRENCE ROAD ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'Old Dixie Highway ' (1) ·
'River Drive ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SR-406 ' (1) ·
'SR-44 ' (1) ·
'SR-50 ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 (SR-5) ' (1)
700178 (1) ·
700227 (1) ·
705923 (1) ·
790128 (1) ·
794123 (1) ·
794124 (1) ·
794193 (1) ·
796413 (1) ·
880085 (1) ·
880089 (1) ·
884085 (1) ·
884086 (1) ·
885811 (1) ·
885812 (1) ·
890093 (1) ·
890102 (1) ·
894047 (1) ·
894048 (1) ·
934258 (1) ·
934259 (1) ·
934515 (1) ·
934904 (1) ·
934914 (1) ·
935750 (1) ·
936776 (1)
'0.1 Mile West of A1A ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'5th St. SW at CR-611 ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'AT TEDDAR ROAD ' (1) ·
'SR-406 over Indian River ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-50 1.0 Mi East of I-95' (1)
26232019 (1) ·
26321988 (1) ·
26373441 (1) ·
26423844 (1) ·
26445836 (1) ·
26451984 (1) ·
26572884 (1) ·
27051685 (1) ·
27085780 (1) ·
27090600 (1) ·
27101012 (1) ·
27354064 (1) ·
27361500 (1) ·
27361889 (1) ·
27382700 (1) ·
27382938 (1) ·
27385744 (1) ·
27591500 (1) ·
28332807 (1) ·
28371291 (1) ·
29011550 (1) ·
29052660 (1) ·
29071179 (1) ·
29210415 (1) ·
29211227 (1)
80051590 (1) ·
80052073 (1) ·
80061282 (1) ·
80062363 (1) ·
80074708 (1) ·
80120012 (1) ·
80121176 (1) ·
80142587 (1) ·
80142967 (1) ·
80180707 (1) ·
80214090 (1) ·
80214400 (1) ·
80225645 (1) ·
80231300 (1) ·
80240150 (1) ·
80254929 (1) ·
80401800 (1) ·
80413113 (1) ·
80475557 (1) ·
80495858 (1) ·
80553031 (1) ·
81013690 (1) ·
81015661 (1) ·
81055781 (1) ·
81060905 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)