Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-3 Canal ' (1) ·
'Canal ' (1) ·
'Casa Mar Dr ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Drainage Canal ' (1) ·
'Header Canal ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD L30 Canal ' (1) ·
'M CANAL ' (1) ·
'Sebastian Canal ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'ST LUCIE CANAL ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'12th Street ' (1) ·
'4th Street ' (1) ·
'Babcock Street ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-68 (Orange Ave)' (1) ·
'CR-76A ' (1) ·
'Gateway Blvd. ' (1) ·
'Hagen Ranch Road ' (1) ·
'HARRIS RD ' (1) ·
'HURON WAY ' (1) ·
'Lake Ida Road ' (1) ·
'LAWRENCE ROAD ' (1) ·
'Lyons Rd ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'Old Dixie Highway ' (1) ·
'SE ST LUCIE BLVD ' (1)
704042 (1) ·
794123 (1) ·
794124 (1) ·
884071 (1) ·
884074 (1) ·
884075 (1) ·
890093 (1) ·
890102 (1) ·
894047 (1) ·
894048 (1) ·
934258 (1) ·
934259 (1) ·
934363 (1) ·
934515 (1) ·
934904 (1) ·
934914 (1) ·
934954 (1) ·
934958 (1) ·
934963 (1) ·
944015 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'4MI W OF FL TRNPK ' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'At CR-613 ' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'AT TEDDAR ROAD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)