Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'CANAL ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Danforth Creek ' (1) ·
'E-1 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'LIPTOG CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Sebastian Canal ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'ST LUCIE CANAL ' (1) ·
'US-1 & FECRR ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'Babcock Street ' (1) ·
'BISCAYNE DRIVE ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-76A ' (1) ·
'HARRIS RD ' (1) ·
'HURON WAY ' (1) ·
'LAWRENCE ROAD ' (1) ·
'MURPHY RD ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'PINE RIDGE WAY ' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SR-44 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-1 (SR-5) ' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
704042 (1) ·
790128 (1) ·
880085 (1) ·
890093 (1) ·
890102 (1) ·
890103 (1) ·
890112 (1) ·
890135 (1) ·
894047 (1) ·
894048 (1) ·
930401 (1) ·
934259 (1) ·
934515 (1) ·
934904 (1) ·
934914 (1) ·
935750 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'AT TEDDAR ROAD ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26232019 (1) ·
26321988 (1) ·
26373441 (1) ·
26423844 (1) ·
26433224 (1) ·
26435320 (1) ·
26435409 (1) ·
26440062 (1) ·
26440066 (1) ·
26451984 (1) ·
26590720 (1) ·
27051685 (1) ·
27085780 (1) ·
27090600 (1) ·
27101012 (1) ·
27102072 (1) ·
27112563 (1) ·
27385744 (1) ·
27531888 (1) ·
29011550 (1)
80051590 (1) ·
80053153 (1) ·
80053241 (1) ·
80060815 (1) ·
80062363 (1) ·
80074708 (1) ·
80120012 (1) ·
80121129 (1) ·
80121176 (1) ·
80133989 (1) ·
80134000 (1) ·
80142587 (1) ·
80142967 (1) ·
80161373 (1) ·
80175123 (1) ·
80180707 (1) ·
80240150 (1) ·
80370127 (1) ·
80372083 (1) ·
80413113 (1) ·
80553031 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)