Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'CANAL C-24 ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Drainage Canal ' (1) ·
'E-3 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'M CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'MAPLE CREEK ' (1) ·
'Sebastian Canal ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'SR-507 ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Ten Mile Creek ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'Babcock Street ' (1) ·
'BISCAYNE DRIVE ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-76A ' (1) ·
'HARRIS RD ' (1) ·
'HURON WAY ' (1) ·
'LAWRENCE ROAD ' (1) ·
'MAPP RD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'Old Dixie Highway ' (1) ·
'Pinehurst Ave N ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'Service Road ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR-50 ' (1) ·
'SR-507 ' (1) ·
'US-1 (SR-5) ' (1) ·
'W LAKE RD CR-717 ' (1) ·
'WB PGA Blvd. ' (1)
700178 (1) ·
700186 (1) ·
704042 (1) ·
704045 (1) ·
794123 (1) ·
794124 (1) ·
880085 (1) ·
890093 (1) ·
890102 (1) ·
894033 (1) ·
894047 (1) ·
894048 (1) ·
930349 (1) ·
934258 (1) ·
934259 (1) ·
934491 (1) ·
934505 (1) ·
934515 (1) ·
934517 (1) ·
934904 (1) ·
934914 (1) ·
935750 (1) ·
940122 (1) ·
940123 (1) ·
945251 (1)
'.5 miles South of SR-70 ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.4 mi N. of SR-80 ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'AT TEDDAR ROAD ' (1) ·
'SR-50 1.0 Mi East of I-95' (1) ·
'SR-507 over Crane Creek ' (1)
26232019 (1) ·
26321988 (1) ·
26322160 (1) ·
26373441 (1) ·
26410978 (1) ·
26420225 (1) ·
26423844 (1) ·
26445836 (1) ·
26451984 (1) ·
26504098 (1) ·
27051685 (1) ·
27080035 (1) ·
27085780 (1) ·
27090600 (1) ·
27101012 (1) ·
27154364 (1) ·
27240492 (1) ·
27241193 (1) ·
27385744 (1) ·
27531888 (1) ·
28040738 (1) ·
28143333 (1) ·
28332807 (1) ·
29210415 (1) ·
29211227 (1)
80035722 (1) ·
80051590 (1) ·
80052073 (1) ·
80052654 (1) ·
80062363 (1) ·
80074708 (1) ·
80102658 (1) ·
80120012 (1) ·
80121176 (1) ·
80142587 (1) ·
80142967 (1) ·
80161820 (1) ·
80180707 (1) ·
80200930 (1) ·
80231981 (1) ·
80232174 (1) ·
80240150 (1) ·
80371675 (1) ·
80372083 (1) ·
80411355 (1) ·
80413113 (1) ·
80413808 (1) ·
80495858 (1) ·
81055781 (1) ·
81060905 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)