Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'16th Street ' (1) ·
'8th Street N ' (1) ·
'Dundas Court ' (1) ·
'HORSESHOE POINT RD' (1) ·
'Indian Rvrsd Pk Rd' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'North 14th Street ' (1) ·
'North 9th Street ' (1) ·
'Port Malabar BL WB' (1) ·
'Riverbend Park Rd ' (1) ·
'US-27/SR-80 NB ' (1) ·
'US-27/SR-80 SB ' (1) ·
'Willowood Drive ' (1)
704032 (1) ·
705920 (1) ·
796000 (1) ·
884081 (1) ·
890101 (1) ·
894063 (1) ·
930537 (1) ·
930538 (1) ·
934176 (1) ·
934516 (1) ·
945013 (1) ·
945014 (1) ·
945015 (1) ·
945016 (1)
'.21 E of Minton Rd. ' (1) ·
'0.1 Miles S. of Ave. D ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.26 Miles North of CR-68' (1) ·
'0.3 Mi N of Orange Ave. ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'At 74th Avenue ' (1) ·
'At John Stretch Park ' (1) ·
'Indian Riverside Park ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)