Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-3 Canal ' (1) ·
'C-51 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'George King Blvd ' (1) ·
'Goat Creek ' (1) ·
'Lake Ida Canal E-4 ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD L30 Canal ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'US-17-92 -St Johns River' (1) ·
George King Blvd (1) ·
SR-401 (1)
'12th Street ' (1) ·
'EB Lake Worth Rd. ' (1) ·
'Gateway Blvd. ' (1) ·
'Hagen Ranch Road ' (1) ·
'HORSESHOE POINT RD' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 WB ' (1) ·
'Lake Ida Road ' (1) ·
'Main Trail ' (1) ·
'NB SR 807 ' (1) ·
'NBSR807 to EBSR80 ' (1) ·
'PALMETTO PK RD ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR-A1A NB ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1) ·
'WB Forest Hill Bld' (1) ·
Overpass Ramp (1) ·
SR-A1A SB (1)
700204 (1) ·
700205 (1) ·
700210 (1) ·
700211 (1) ·
700218 (1) ·
790196 (1) ·
796000 (1) ·
884075 (1) ·
890101 (1) ·
930329 (1) ·
930474 (1) ·
930475 (1) ·
930490 (1) ·
930512 (1) ·
930513 (1) ·
930514 (1) ·
931004 (1) ·
934363 (1) ·
934902 (1) ·
934958 (1) ·
934963 (1)
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.7 miles N of SR 806 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-A1A - George King Blvd' (1) ·
'US-1 NB over Goat Creek ' (1) ·
'US-1 SB over Goat Creek ' (1) ·
0.7 Mile N of SR-528 (1) ·
SR-A1A SB- George King (1)
26210226 (1) ·
26234852 (1) ·
26234905 (1) ·
26282306 (1) ·
26290179 (1) ·
26295890 (1) ·
26325823 (1) ·
26370804 (1) ·
26390300 (1) ·
26403445 (1) ·
26403485 (1) ·
26404472 (1) ·
27084791 (1) ·
27372705 (1) ·
27580607 (1) ·
27580636 (1) ·
28241290 (1) ·
28241322 (1) ·
28250000 (1) ·
28500808 (1) ·
29165358 (1)
80044365 (1) ·
80045890 (1) ·
80045945 (1) ·
80062196 (1) ·
80074511 (1) ·
80074852 (1) ·
80075116 (1) ·
80094882 (1) ·
80095982 (1) ·
80102700 (1) ·
80112778 (1) ·
80264806 (1) ·
80323926 (1) ·
80324008 (1) ·
80350835 (1) ·
80350917 (1) ·
80370688 (1) ·
80370748 (1) ·
80375599 (1) ·
81054109 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)