Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'C-17 Canal ' (1) ·
'CANAL ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'I-95 ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'St Lucie River / SR-707 ' (1) ·
'St. Lucie River/SR-707 ' (1) ·
'Tomoka River ' (1)
'EB Blue Heron Blvd' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'HORSESHOE POINT RD' (1) ·
'INLET CAY DR. ' (1) ·
'JOG RD NB ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'Main Trail ' (1) ·
'NB US-1 / SR-5 ' (1) ·
'PALMETTO PK RD ' (1) ·
'SABLE ISLAND DRIVE' (1) ·
'SB US-1/SR-5 ' (1) ·
'SR-3 ' (1) ·
'SR-40 EB ' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-44 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'WB Blue Heron Blvd' (1)
700197 (1) ·
700198 (1) ·
700201 (1) ·
790163 (1) ·
790172 (1) ·
790174 (1) ·
790175 (1) ·
796000 (1) ·
890101 (1) ·
890151 (1) ·
890152 (1) ·
930467 (1) ·
930468 (1) ·
934360 (1) ·
934902 (1) ·
934948 (1) ·
934952 (1) ·
936654 (1) ·
936655 (1)
'0.04Mi W OF A1A ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1 Mile East of I-95 ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'ADJACENT TO US-441 ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-40 EB - Tomoka River ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)