Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'Drainage Ditch ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'M-2 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'WARNER CREEK ' (1)
704032 (1) ·
790171 (1) ·
796000 (1) ·
890101 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
934126 (1) ·
934240 (1) ·
934516 (1) ·
934950 (1) ·
934960 (1) ·
936551 (1)
'.21 E of Minton Rd. ' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'LPGA Blvd. at I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)