Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBARA BASIN ' (1) ·
'Berrys Canal ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'Conners Canal ' (1) ·
'Drainage Ditch ' (1) ·
'E-2-E Canal ' (1) ·
'E-3 CANAL ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-5 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'NORTH CANAL ' (1) ·
'Raulerson Canal ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'ST. LUCIE RIVER ' (1) ·
Banana River Relief (1)
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'EB SR60 ' (1) ·
'HORSESHOE POINT RD' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'Lake Worth Road ' (1) ·
'LINTON BLVD ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'PALMETTO PK RD ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'S Williamson Blvd ' (1) ·
'Saxon Blvd EB ' (1) ·
'SB US-27 SR-25 ' (1) ·
'SIMARA STREET ' (1) ·
'SR-44 ' (1) ·
'SR-60 WB ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-700 ' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'Willowood Drive ' (1) ·
SR-520 (1)
700192 (1) ·
704032 (1) ·
790149 (1) ·
790150 (1) ·
790167 (1) ·
794095 (1) ·
880077 (1) ·
884057 (1) ·
884058 (1) ·
884059 (1) ·
884060 (1) ·
890101 (1) ·
895505 (1) ·
930352 (1) ·
930451 (1) ·
930456 (1) ·
931001 (1) ·
934155 (1) ·
934156 (1) ·
934485 (1) ·
934516 (1) ·
934902 (1) ·
944011 (1) ·
944012 (1)
'.21 E of Minton Rd. ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.25MI E OF SEWALLS PT RD' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'3Mi. S of CR-717 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Palm Beach - Broward Line' (1) ·
'S. Williamson BI-I-95 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1) ·
SR-520 - Banana River (1)
26200870 (1) ·
26210226 (1) ·
26262127 (1) ·
26370275 (1) ·
26370347 (1) ·
26400360 (1) ·
26455824 (1) ·
26455826 (1) ·
26470182 (1) ·
27084791 (1) ·
27111437 (1) ·
27192572 (1) ·
27193001 (1) ·
27375640 (1) ·
27385855 (1) ·
27385856 (1) ·
27392294 (1) ·
27392357 (1) ·
28030000 (1) ·
28212829 (1) ·
28543983 (1) ·
29014148 (1) ·
29015737 (1) ·
29072045 (1)
80051706 (1) ·
80051771 (1) ·
80074511 (1) ·
80074904 (1) ·
80102258 (1) ·
80102528 (1) ·
80111729 (1) ·
80112778 (1) ·
80195964 (1) ·
80200618 (1) ·
80221680 (1) ·
80225809 (1) ·
80225872 (1) ·
80230306 (1) ·
80230357 (1) ·
80313151 (1) ·
80321939 (1) ·
80365438 (1) ·
80400400 (1) ·
80491520 (1) ·
80545970 (1) ·
80551845 (1) ·
81025225 (1) ·
81161879 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)