Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF MIAMI CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'DIRT FARM ROAD ' (1) ·
'Drainage Ditch ' (1) ·
'Intracoastal Waterway ' (1) ·
'Jupiter Creek ' (1) ·
'L-38 CANAL ' (1) ·
'Lake Gertie ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'RCA CANAL ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR 70 ' (1) ·
'WARNER CREEK ' (1) ·
Tillman Canal (1)
'CR-92 WB ' (1) ·
'DIXIE HIGHWAY ' (1) ·
'EB Prt St Lucie Bd' (1) ·
'FLYING COW ROAD ' (1) ·
'HORSESHOE POINT RD' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD SB ' (1) ·
'LINTON BLVD. ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PALMETTO PK RD ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR-656 (17th St.) ' (1) ·
'WB Martin Downs Bd' (1) ·
'Willowood Drive ' (1) ·
SR-507 SB (1)
700190 (1) ·
704032 (1) ·
794121 (1) ·
880077 (1) ·
890101 (1) ·
890113 (1) ·
890143 (1) ·
930420 (1) ·
934139 (1) ·
934222 (1) ·
934292 (1) ·
934483 (1) ·
934516 (1) ·
934902 (1) ·
934918 (1) ·
934934 (1) ·
934935 (1) ·
940134 (1) ·
940140 (1)
'.21 E of Minton Rd. ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.4 Mi West of US 17-92 ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'2mi. East of SR-91 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-80 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
SR-507 SB-Tillman Canal (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)